Certej Project

Certej Project

Au, Ag
Reserves: 2.41Moz Au, 17.3Moz Ag

Certej is an epithermal gold/silver deposit located in the “Golden Quadrilateral” area of the Apuseni Mountains of Transylvania in Western Romania, 12km from the regional town of Deva. European Goldfields owns 80% of the project through its subsidiary Deva Gold S.A. (“Deva Gold”).

There is an existing open pit that was operated by the Romanian State mining entity Minvest, until 2006 for which Deva Gold holds a valid operating permit.

Certej location map

Project Highlights

  • Definitive Feasibility Study completed
  • New urbanisation certificate awarded
  • Updated mining permit – Permitting process advanced
  • Life of mine 16 years
  • Basic engineering completed by Aker Solutions
  • Commencement of Technical Study for Construction permit application

Reserves & Resources


Reserves

'000t

Au
g/t

Au
Moz

Ag
g/t

Ag
Moz

Probable in-pit32,8112.0 2.1211.4 12.0
Probable lower-grade7,8290.70.1814.03.5
Probable in existing dumps6,320 0.5 0.11 8.9 1.8 
Total46,960-2.41-17.3
Resources

  

  

 

 

  

Measured 3,922 2.3 0.29 50.7
Indicated 37,5491.9 2.32 11 13.7
Total In-Pit M&I 41,4712.0 2.61 1114.3
Certej Existing Dumps       
Indicated7,0220.530.1292.0
Total M&I48,4932.73 16.3 
Inferred7,1271.50.3461.4

Project Development

  • MD in Romania is former Director General of state miner Minvest
  • Certej open pit and plant worked until 2006
  • Skilled operators available for mine and plant
  • High local unemployment
  • Region has strong mining history
  • Local fabrication skills
  • Steelworks in region
  • Basic engineering design nears completion
  • Certej independent technical consultant appointed and review in progress
Project development

Definitive Feasibility Study

Certej Definitive Feasibility Study (8 Mb PDF)

Project Summary

Reserves Yrs 1-11.5 32.8 Mt @ 2.0g/t Au 11.4g/t Ag 
Yrs 11.5-1614.1Mt @ 0.64g/t Au 11.7 g/t Ag
Strip ratioYrs 1-11.53.1:1 
Annual throughput 3Mt 
Overall recoveries 81%  Au, 74% Ag 
Life of Mine 16 years 
Production rate (oz)
Au
Ag

Yrs 1-3
172,000
720,000
 
Yrs 1-11.5
155,000
816,000 
Initial Capex €133.4M  
Sustaining Capex  €47.4M  
Cash cost  US$370/oz 